Removal Procedure
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 5P-3931     | Anti-Seize Compound     | -     |
- Drain the coolant from the cooling system into a suitable container for storage or disposal. Refer to Operation and Maintenance Manual, "Cooling System Coolant - Change".
- Place Mark (X) at all four locations as shown. This action will aid in the installation of the lines group.
![]() | |
Illustration 1 | g02345276 |
- Loosen clamp assemblies (1) and (3) . Remove lines group (2) .
- Remove both clamp assemblies (5) . Remove bellows (6) and position exhaust tube assemblies (4) and (7) aside. Discard clamp assemblies (5) and bellows (6) .
![]() | |
Illustration 2 | g02125717 |
NOTICE |
---|
Failure to follow established procedures can lead to damage of the parts. To avoid damage to the parts, always identify and mark the parts so that the parts can be installed in the same location. |
![]() |
The ends of the bellows are very sharp. Injury could occur if the bellows are not handled properly. Handle the bellows by the convolutions. |
Note: Refer to Special Instruction, REHS1728, "Application Guideline for the Bellows" for additional information on handling the bellows if the machine is equipped.
- Place Mark (Y) at all four locations as shown. This action will aid in the installation of the lines group.
![]() | |
Illustration 3 | g02345486 |
- Loosen clamp assemblies (8) and (10) and discard the clamp assemblies. Remove lines group (9) .
- Remove both clamp assemblies (12) . Remove bellows (13) and position elbow assemblies (11) and (14) aside. Discard clamp assemblies (12) and bellows (13) .
![]() | |
Illustration 4 | g02345541 |
Note: Refer to Special Instruction, REHS1728, "Application Guideline for the Bellows" for additional information on handling the bellows if the machine is equipped.
- Loosen clamp assembly (15) . Remove two nuts (16) and remove elbow assembly (17) .
![]() | |
Illustration 5 | g02126160 |
- Loosen clamp assembly (23) and remove bolts (20) and (18) . Remove tube assembly (19) .
- Remove bolts (22) and remove elbow assembly (21) .
- Remove clamp assemblies (15) and separate elbow (17) from bellows (22) . Discard clamp assemblies (15) and bellows (24) after removal.
![]() | |
Illustration 6 | g02346038 |
- Remove clamp assembly (25) and disconnect hose assembly (29) .
![]() | |
Illustration 7 | g02345993 |
- Remove tube assembly (28) .
- Disconnect tube assemblies (26) and (27) .
- Disconnect fitting (30) . Remove bolts (31) and remove tube assembly (32) .
![]() | |
Illustration 8 | g02129989 |
View from the rear of the engine |
- Loosen clamp assemblies (33) and (35) . Remove tube assembly (34) .
- Remove and discard clamp assemblies (36) . Use two people in order to remove exhaust cooler (37) . The weight of exhaust cooler (37) is approximately 18 kg (40 lb).
![]() | |
Illustration 9 | g02130322 |
Note: NRS cooler clamp assemblies (9) are a one time use only. Discard used clamp assemblies (9) .
Installation Procedure
- Install the exhaust cooler (37) in the reverse order.
- When installing new clamp assemblies (36) , ensure the rounded edges of clamp spacers (36a) are oriented as shown.
Show/hide tableIllustration 10 g03339899
Note: NRS cooler clamp assemblies (9) are a one time use only. Discard used clamp assemblies (9) .
- Tighten new clamp assemblies (36) to a torque of 40 ± 5 N·m (30 ± 4 lb ft).
- Tighten clamp assembly (33) to a torque of 8.5 ± 2 N·m (75 ± 18 lb in).
- Position the new bellows (24) , new clamp assemblies (15) , and elbow (17) into position. Apply Tooling (A) to the threads of clamp assemblies (15) . Ensure that the flow indicator on the bellows is in the position that is shown in the above illustration. Tighten clamp assemblies (15) to a torque of 7.5 ± 2 N·m (66 ± 18 lb in).
Show/hide tableIllustration 11 g02346038
- Apply Tooling (A) on the threads of the studs and the threads on new nuts (16) . Tighten the new nuts (16) to a torque of 70 ± 5 N·m (52 ± 4 lb ft).
- Tighten clamp assemblies (23) to a torque of 20 ± 2 N·m (177 ± 18 lb in).
- Position new clamp assemblies (12) onto bellows (13) . Position elbow assemblies (11) and (14) .
Show/hide tableIllustration 12 g02345541
- Tighten clamp assemblies (12) to a torque of 8.5 ± 2 N·m (75 ± 18 lb in).
- Position new bellows (6) , new clamp assemblies (5) , and exhaust tube assemblies (4) and (7) into position. Ensure that the flow indicator on the bellows is in the position that is shown in the above illustration. Tighten clamp assemblies (5) to a torque of 8.5 ± 1 N·m (75 ± 9 lb in). Torque the clamp assemblies again after the engine has been run.
Show/hide tableIllustration 13 g02125717
- Position new clamp assemblies (1) and (3) . Tighten clamp assemblies (1) and (3) to a torque of 20 ± 2 N·m (177 ± 18 lb in).
- Position new clamp assemblies (8) and (10) . Tighten clamp assemblies (8) and (10) to a torque of 20 ± 2 N·m (177 ± 18 lb in).
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.