Stick Bearings and Seals - Install
`
315C Excavator Machine Systems
[RENR5525]
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
315C Excavator Machine Systems
Bucket Cylinder - Remove and Install
IMPLEMENTS
STICK GP
315B Excavator Excavator Systems
Stick - Remove
315B Excavator Excavator Systems
Stick - Install
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
315C Excavator Machine Systems
Stick Bearings and Seals - Install
1.1. Installation Procedure
Installation Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-0520     | Driver Group     | 1     |
- Lower the temperature of the bearings for the pin joint for the boom. Install the bearings in the stick at the pin joint for the boom. Install the bearings in the pin bore until each bearing is 9.5 ± 0.8 mm (0.37 ± 0.03 inch) below the outside surface of the stick.
Note: Be sure that the pin bores in the stick are clean prior to installation of the bearings and lip seals.
- Lower the temperature of the bearings for the pin joint for the bucket. Install the bearings in the stick at the pin joint for the bucket. Install the bearings in the pin bore until each bearing is 7.5 ± 0.8 mm (0.30 ± 0.03 inch) below the outside surface of stick.
- Use Tooling (A) to install lip seals (2) in the stick at the pin joint for the boom. Install the lip seals until each lip seal makes contact with the bearing.
Note: Install lip seals with the sealing lip toward the outside of the pin bore. The sealing lip prevents dirt and debris from entering the pin bores.
Show/hide table
![]() | |
Illustration 1 | g00476727 |
- Use Tooling (A) to install the lip seals (1) in the stick at the pin joint for the bucket. Install the lip seals until each lip seal makes contact with the bearing.
Show/hide table
![]() | |
Illustration 2 | g00476726 |
End By: Install the stick. Refer to Disassembly and Assembly, "Stick - Install".
Information System:
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Install
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems
Pilot Valve (Travel) - Install
315C Excavator Machine Systems
Pilot Valve (Travel) - Remove
315C Excavator Machine Systems
Shuttle Valve - Install - Auxiliary Control
315C Excavator Machine Systems
Pilot Valve (Implement) - Assemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Install
315C Excavator Machine Systems
Pilot Valve (Implement) - Disassemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Remove
315C Excavator Machine Systems
Undercarriage Frame - Install
315C Excavator Machine Systems
Track Carrier Roller - Install
320C, 322C and 325C Excavators Tool Control System
Implement Electronic Control Module (Tool)
5130B Excavator
Hydraulic Oil Tank Filters - Replace
5230B Excavator Hydraulic System
Piston Pump (Implement)
H140CS and H160CS Hydraulic Hammers
Hydraulic Hammer Troubleshooting
5230B Excavator Hydraulic System
Piston Pump (Swing)
365B, 365B Series II and 365BL Excavators
Grapple and Magnet Control
5230B Excavator Hydraulic System
Final Drive
5130B Excavator
Track Roller and Idler - Check
5130B Excavator
Travel Control
Troubleshooting Guide for 122-9897 Implement Electronic Control Module {5702}
3126B Engine for Lexion 450, Lexion 460, and Lexion 460 R Combines
Air Inlet Heater Circuit - Test
2001/06/25
New Stiffener Plates Improve the Durability of the Front Skirt of Pickup Brooms {6708}