Bucket Linkage Bearings and Seals - Install
`
315C Excavator Machine Systems
[RENR5525]
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
IMPLEMENTS
LINKAGE GP
307B Excavator Machine Systems
Bucket Linkage - Remove
315B Excavator Excavator Systems
Bucket Linkage - Install
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Install
1.1. Installation Procedure
Installation Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-0520     | Driver Group     | 1     |
Note: Make sure that the bore in the stick and the bores in the link assembly are thoroughly clean and free of dirt. Make sure that the sleeve bearings and the lip seals are thoroughly clean and free of dirt.
- Lower the temperature of the sleeve bearings for the stick at the pin joint for the bucket control linkage. Use Tooling (A) and a hammer to install the bearings in the stick. Install the bearings 7.5 ± 0.8 mm (0.30 ± 0.03 inch) below the outside surface of the stick.
- Lower the temperature of the sleeve bearings for the closed end of the link assembly. Use Tooling (A) and a hammer to install the bearings in the link assembly. Install the bearings 7.5 ± 0.8 mm (0.03 ± 0.03 inch) below the outside surface of the link assembly.
- Lower the temperature of the sleeve bearings for the open end of the link assembly. Use Tooling (A) and a hammer to install the bearings in the link assembly. Install the bearings 7.5 ± 0.8 mm (0.30 ± 0.03 inch) below the outside surface of the link assembly.
- Use Tooling (A) to install the lip seals in the link assembly. Install the lip seals with the sealing lip toward the outside of the pin bores. Install the lip seals until the seals make contact with the sleeve bearings.
Note: Install lip seals with the sealing lip toward the outside of the pin bore. The sealing lip prevents dirt and debris from entering the pin bores.
- Use Tooling (A) to install the lip seals in the stick. Install the lip seals with the sealing lip toward the outside of the pin bores. Install the lip seals until the seals make contact with the sleeve bearings.
End By: Install the bucket control linkage. Refer to Disassembly and Assembly, "Bucket Linkage - Install".
Information System:
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems
Pilot Valve (Travel) - Install
315C Excavator Machine Systems
Pilot Valve (Travel) - Remove
315C Excavator Machine Systems
Shuttle Valve - Install - Auxiliary Control
315C Excavator Machine Systems
Pilot Valve (Implement) - Assemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Install
315C Excavator Machine Systems
Pilot Valve (Implement) - Disassemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Remove
315C Excavator Machine Systems
Undercarriage Frame - Install
315C Excavator Machine Systems
Track Carrier Roller - Install
315C Excavator Machine Systems
Shuttle Valve - Install - Straight Travel
315C Excavator Machine Systems
Undercarriage Frame - Remove
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
315C Excavator Machine Systems
Stick Bearings and Seals - Install
320C, 322C and 325C Excavators Tool Control System
Implement Electronic Control Module (Tool)
5130B Excavator
Hydraulic Oil Tank Filters - Replace
5230B Excavator Hydraulic System
Piston Pump (Implement)
H140CS and H160CS Hydraulic Hammers
Hydraulic Hammer Troubleshooting
5230B Excavator Hydraulic System
Piston Pump (Swing)
365B, 365B Series II and 365BL Excavators
Grapple and Magnet Control
5230B Excavator Hydraulic System
Final Drive
5130B Excavator
Track Roller and Idler - Check
5130B Excavator
Travel Control
Troubleshooting Guide for 122-9897 Implement Electronic Control Module {5702}