Bucket Linkage Bearings and Seals - Remove
`
315C Excavator Machine Systems
[RENR5525]
315C Excavator Machine Systems
Pilot Valve (Travel) - Install
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Install
IMPLEMENTS
LINKAGE GP
307B Excavator Machine Systems
Bucket Linkage - Remove
315B Excavator Excavator Systems
Bucket Linkage - Install
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Install
1.1. Removal Procedure
Removal Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 3S-6224     | Electric Hydraulic Pump     | 1     |
8T-5343 | Pressure Gauge     | 1     | |
3B-7722 | Reducing Bushing     | 2     | |
1P-2376 | Quick Coupler Assembly     | 2     | |
1P-2377 | Plug Assembly     | 2     | |
8F-0024 | Hose Assembly     | 2     | |
6V-0113 | Cylinder     | 1     | |
4C-9634 | Puller Stud     | 1     | |
9U-6832 | Fast Runner Nut Assembly     | 1     | |
5P-8625 | Spacer     | 1     | |
9U-5337 | Bearing Puller Adapter     | 1     |
Start By:
- Remove the bucket control linkage. Refer to Disassembly and Assembly, "Bucket Linkage - Remove".
- Remove lip seals (1) from link assembly (2) .
Show/hide table
![]() | |
Illustration 1 | g00474124 |
- Remove bearings (3) from the open end of the link assembly with Tooling (A). Fasten Tooling (A) to the link assembly, as shown. Fasten a suitable lifting device to Tooling (A) for support. Remove the bearing (3). Remove bearing (3) on the other side of the link assembly in the same manner.
Show/hide table
![]() | |
Illustration 2 | g00474127 |
- Remove the bearings from the closed end of the link assembly with a chisel or by cutting.
- Remove lip seals (4) from the stick at the pin joint for the bucket control linkage.
Show/hide table
![]() | |
Illustration 3 | g00474169 |
- Use Tooling (A) to remove the bearings from the stick at the pin joint for the bucket control linkage. Fasten Tooling (A) to the bearing, as shown. Fasten a suitable lifting device to Tooling (A) for support. Remove the bearing. Remove the bearing on the opposite side of the stick in the same manner.
Show/hide table
![]() | |
Illustration 4 | g00474170 |
Information System:
315C Excavator Machine Systems
Pilot Valve (Travel) - Install
315C Excavator Machine Systems
Pilot Valve (Travel) - Remove
315C Excavator Machine Systems
Shuttle Valve - Install - Auxiliary Control
315C Excavator Machine Systems
Pilot Valve (Implement) - Assemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Install
315C Excavator Machine Systems
Pilot Valve (Implement) - Disassemble
315C Excavator Machine Systems
Pilot Valve (Implement) - Remove
315C Excavator Machine Systems
Undercarriage Frame - Install
315C Excavator Machine Systems
Track Carrier Roller - Install
315C Excavator Machine Systems
Shuttle Valve - Install - Straight Travel
315C Excavator Machine Systems
Undercarriage Frame - Remove
315C Excavator Machine Systems
Shuttle Valve - Remove - Straight Travel
315C Excavator Machine Systems
Bucket Linkage Bearings and Seals - Install
315C Excavator Machine Systems
Stick Bearings and Seals - Remove
315C Excavator Machine Systems
Stick Bearings and Seals - Install
320C, 322C and 325C Excavators Tool Control System
Implement Electronic Control Module (Tool)
5130B Excavator
Hydraulic Oil Tank Filters - Replace
5230B Excavator Hydraulic System
Piston Pump (Implement)
H140CS and H160CS Hydraulic Hammers
Hydraulic Hammer Troubleshooting
5230B Excavator Hydraulic System
Piston Pump (Swing)
365B, 365B Series II and 365BL Excavators
Grapple and Magnet Control
5230B Excavator Hydraulic System
Final Drive
5130B Excavator
Track Roller and Idler - Check
5130B Excavator
Travel Control