315C Excavator Machine Systems Undercarriage Frame - Install Caterpillar


Undercarriage Frame - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     228-4532     Link     1    
B     2P-5550     Electric Hydraulic Pump Gp     1    
8S-7645 Hydraulic Jack Hose Gp     3    
8S-7650 Cylinder As     3    
4C-6486 Stand     3    
8S-7631 Tube     3    
8S-7615 Pin     3    
8S-7625 Collar     3    
8S-8048 Saddle     1    
C     1U-8846     Gasket Sealant     1    
D     5P-3931     Anti-Seize Compound     1    
E     9S-3263     Thread Lock Compound     1    

Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "AVSpare Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on AVSpare products.

Dispose of all fluids according to local regulations and mandates.


  1. Make sure that the mating surfaces of the upper structure and the undercarriage frame are thoroughly clean and free of dirt and debris.



    Illustration 1g00365587

  1. Install four suitable sized guide bolts (16) in the mounting bolt holes in the upper structure, as shown. Install the guide bolts 90 degrees from each other.

  1. Apply Tooling (C) to the mating surface of the swing gear. Apply Tooling (C) on the mating surface of the bearing of the undercarriage frame. Apply Tooling (D) in the hole for the locating dowel in the undercarriage frame.

  1. Use a lift truck to position undercarriage frame (15) under the upper structure. Block the undercarriage frame so that the undercarriage frame cannot move.


    NOTICE

    Failure to properly assemble parts or failure to follow established procedures can lead to damage of the parts and assembly.

    To avoid damage to parts, always identify and mark the parts so that they can be installed in the same location. Ensure that gear surfaces align. Never force parts during assembly.





    Illustration 2g00805481

  1. Remove the pins from the tubes of Tooling (B). Use Tooling (B) to lower the upper structure in 13 mm (0.5 inch) increments. Align the guide bolts in the upper structure with the bolt holes in the undercarriage frame. Move the undercarriage frame in order to obtain the correct alignment.

  1. As the upper structure is being lowered, check that the pinion shaft aligns with the swing gear and bearing. Check that the dowel in the upper structure aligns with the dowel hole in the swing gear and bearing.



    Illustration 3g00365267

  1. Apply Tooling (E) to the threads of bolts (13) that hold the upper structure to the undercarriage frame. Install bolts (13) and tighten bolts (13) to a torque of 570 ± 60 N·m (420 ± 44 lb ft).

  1. Connect tube assembly (12) to the fitting on the front of the upper structure.



    Illustration 4g01021420

  1. Install clamp (10) over the boot of the swivel. Install hose fittings (11) and lock bolt (9) in the swivel.

  1. Install hose fittings (8) in the swivel.



    Illustration 5g00365264

  1. Connect four hose assemblies (7) .



    Illustration 6g00365075

  1. Remove Tooling (A) from the machine.

  1. Start the machine and raise the boom. Remove Tooling (B) from the stick.

  1. Install right hand boom cylinder (6). Refer to Disassembly and Assembly, "Boom Cylinder - Install".



    Illustration 7g00365260

  1. Remove Tooling (B) from the rear of the machine.



    Illustration 8g01021419



    Illustration 9g00364733

  1. Remove cover (3) and thrust plate (4) from each final drive.



    Illustration 10g00364741

  1. Install sun gear (5) in each final drive.

  1. Make sure that the machined surface of the ring gear in the final drive is thoroughly clean, free of dirt and debris and dry. Make sure that the machined surface of cover (3) is thoroughly clean, free of dirt and debris and dry. Apply Tooling (C) around the machined surface of the ring gear. Put cover (3) in the cover's original position on the ring gear.

  1. Apply Tooling (E) on the threads of bolts (1) that hold cover (2) in position. Install bolts (1) and the washers that hold the cover. Tighten bolts (1) to a torque of 29 ± 2 N·m (21 ± 1 lb ft).

  1. Fill each final drive with oil to the correct level. Fill the hydraulic oil tank with oil to the correct level. Refer to Operation and Maintenance Manual, "Lubricant Viscosities and Refill Capacities".

End By: Install the bucket. Refer to Disassembly and Assembly, "Bucket - Install".

Information System:

315C Excavator Machine Systems Track Carrier Roller - Install
315C Excavator Machine Systems Shuttle Valve - Install - Straight Travel
315C Excavator Machine Systems Undercarriage Frame - Remove
315C Excavator Machine Systems Shuttle Valve - Remove - Straight Travel
315C Excavator Machine Systems Swing Drive - Install
315C Excavator Machine Systems Swing Drive - Remove
315C Excavator Machine Systems Shuttle Valve - Remove - Auxiliary Control
W345B Series II Material Handler Machine System Specifications Swing Drive - Left Swing Drive and Right Swing Drive
315C Excavator Machine Systems Pump Control - Install
345B Excavator Equipment Lowering with Engine Stopped
315C Excavator Machine Systems Pump Control - Remove
315C Excavator Machine Systems Main Control Valve - Install
315C Excavator Machine Systems Pilot Valve (Implement) - Remove
315C Excavator Machine Systems Pilot Valve (Implement) - Disassemble
315C Excavator Machine Systems Pilot Valve (Implement) - Install
315C Excavator Machine Systems Pilot Valve (Implement) - Assemble
315C Excavator Machine Systems Shuttle Valve - Install - Auxiliary Control
315C Excavator Machine Systems Pilot Valve (Travel) - Remove
315C Excavator Machine Systems Pilot Valve (Travel) - Install
315C Excavator Machine Systems Bucket Linkage Bearings and Seals - Remove
315C Excavator Machine Systems Bucket Linkage Bearings and Seals - Install
315C Excavator Machine Systems Stick Bearings and Seals - Remove
315C Excavator Machine Systems Stick Bearings and Seals - Install
320C, 322C and 325C Excavators Tool Control System Implement Electronic Control Module (Tool)