1.1. Installation Procedure
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 8S-7640 | Stand | 2 |
8S-7631 | Tube | 2 | |
8S-8048 | Saddle | 2 | |
8S-7615 | Pin | 2 | |
B | 350-7768 | Electric Hydraulic Pump (115V) (1) | 1 |
141-1785 | Receiving Sleeve | 1 | |
137-8460 | Puller Stud | 1 | |
9U-5346 | Nut | 1 | |
6V-3175 | Hydraulic Cylinder | 1 | |
C | 4C-9485 | Pin Driver Cap | 1 |
D | 452-6006 | Molybdenum Grease | 1 |
Show/hide table
(1) | 350-7769 Electric Hydraulic Pump (230V) is available. |
Show/hide table
![]() |
When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death. |
- Attach a suitable lifting device to boom (18), as shown. The weight of the boom and the stick cylinder is approximately
1635 kg (3600 lb) .Note: Apply a thin coat of Tooling (D) to the bores in the upper frame and in the bore for the boom foot pin. Apply a thin coat of Tooling (D) to the lip of lip type seals.
Show/hide tableIllustration 2 g01349055 - Apply a thin coat of Tooling (D) to pin (19).
- Install Tooling (C) in pin (19).
- Position boom (18) and install pin (19). Remove Tooling (C).
Show/hide table
Illustration 3 g01349007 - Measure the total clearance between the boom and the upper frame at the bore for the boom foot pin. The total clearance of Dimension (a) plus Dimension (b) must not be more than
1.0 mm (0.04 inch) . If the total clearance is less than1.0 mm (0.04 inch) , the addition of shims between the boom and the upper frame will not be required. If the total clearance is more than1.0 mm (0.04 inch) , add the correct thickness of shims to obtain the required clearance. - Use the following table to determine the correct shims (20).
Show/hide table
Table 2 Table for Shims (30) Shim Thickness (mm) 212-2838 2.0(1) 113-2127 0.5 093-0084 1.0 093-0116 2.0 Show/hide table(1) If this shim is required, use next to the boom. - Install the correct shims.
- Repeat Steps 2 through 4.
Show/hide table
Illustration 4 g01349064 - Install bolt (17).
- Install sensor (15) and install support (14).
- Install bolt (16).
Show/hide table
Illustration 5 g01348675 - Install panels (11), (12), and (13).
Show/hide table
Illustration 6 g01349070 - Position panel (10) and install bolts (9).
Show/hide table
Illustration 7 g01348645 - Apply a thin coat of Tooling (D) to the pin.
- Partially install the pin and install shim (8).
Show/hide table
Illustration 8 g01348639 - Attach a suitable lifting device to boom cylinder (5). The weight of boom cylinder (5) is approximately
285 kg (628 lb) .Show/hide tableIllustration 9 g01349131 - Position boom cylinder (5) and spacer (7).
Show/hide table
Illustration 10 g01348630 - Position retainer plate (6) and install bolts (4).
- Remove the suitable lifting device from boom cylinder (5).
Show/hide table
Illustration 11 g01348621 - Connect grease hose assembly (4).
- Repeat for the opposite boom cylinder.
Show/hide table
Illustration 12 g01348609 - Connect all hose assemblies (1) and connect harness assembly (2).
- Fill the hydraulic oil. Refer to Operation and Maintenance Manual, "Hydraulic System Oil - Change" for the correct filling procedure.
Note: Make sure that the pin bores in the boom and the pin bores in the upper frame are clean and free of dirt and debris prior to installing the boom in the upper frame.
Show/hide table
![]() | |
Illustration 1 | g01348695 |
End By:
- Install the stick.
Information System:
New Cylinder Head Bolts are Now Used on Certain Excavators {5457, 5458}
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System
Relief Valve (Swing)
325F Excavator Machine Systems
Boom - Remove
C2.4 Tier 4 Final Engines for Caterpillar Built Machines
Crankshaft - Install
312F and 313F Excavator Machine Systems
Specifications
312F and 313F Excavator Machine Systems
Gear Pump (Pilot) - Test
325F Excavator Machine Systems
Boom Cylinder - Remove and Install
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System
Swing Hydraulic System
325F Excavator Machine Systems
Drift Reduction Valve (Boom) - Assemble
325F Excavator Machine Systems
Drift Reduction Valve (Boom) - Disassemble
312F and 313F Excavator Machine Systems
Pump Control (Negative Flow) - Test
Installation Procedure for the 467-4407 Front Lines Gp On Certain Hydraulic Excavators {5057}
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System
Oil Makeup (Swing System)
300.9D VPS Mini Hydraulic Excavator Machine Systems
Compression - Test
312F and 313F Excavator Machine Systems
Engine Control
312F and 313F Excavator Machine Systems
Electronic Control (Machine System)
312F and 313F Excavator Machine System Specifications
Main Hydraulic Pump
312F and 313F Excavator Machine System Specifications
Pump Head (Main)
318F Excavator Machine Systems
Final Drive
312F and 313F Excavator Machine System Specifications
Boom Cylinder Lines
Inspection of the Rear of the Engine on Certain C3.3, C4.4, and C7.1 Engines {1161, 1201}
316F Excavator Machine System Specifications
Fuel Tank and Mounting
320D2 GC Excavator Engine Supplement
Battery - Remove and Install
320D2 GC Excavator Engine Supplement
Fuel Priming Pump - Remove and Install