325F Excavator Machine Systems Boom - Install Caterpillar


Boom - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
8S-7640  Stand 
8S-7631 Tube 
8S-8048 Saddle 
8S-7615 Pin 
350-7768  Electric Hydraulic Pump (115V) (1) 
141-1785 Receiving Sleeve 
137-8460 Puller Stud 
9U-5346 Nut 
6V-3175 Hydraulic Cylinder 
4C-9485  Pin Driver Cap 
452-6006  Molybdenum Grease 
(1) 350-7769 Electric Hydraulic Pump (230V) is available.

------ WARNING! ------

When you are using hydraulic cylinders and puller studs, always ensure that the rated capacity of the puller stud meets or exceeds the rated capacity of the hydraulic cylinder. If the puller stud does not meet or exceed the rated capacity of the hydraulic cylinder, a sudden failure of the puller stud could occur. The sudden failure of the puller stud could result in personal injury or death.


    Note: Make sure that the pin bores in the boom and the pin bores in the upper frame are clean and free of dirt and debris prior to installing the boom in the upper frame.



    Illustration 1g01348695

  1. Attach a suitable lifting device to boom (18), as shown. The weight of the boom and the stick cylinder is approximately 1635 kg (3600 lb).

    Note: Apply a thin coat of Tooling (D) to the bores in the upper frame and in the bore for the boom foot pin. Apply a thin coat of Tooling (D) to the lip of lip type seals.



    Illustration 2g01349055

  2. Apply a thin coat of Tooling (D) to pin (19).

  3. Install Tooling (C) in pin (19).

  4. Position boom (18) and install pin (19). Remove Tooling (C).


    Illustration 3g01349007

  5. Measure the total clearance between the boom and the upper frame at the bore for the boom foot pin. The total clearance of Dimension (a) plus Dimension (b) must not be more than 1.0 mm (0.04 inch). If the total clearance is less than 1.0 mm (0.04 inch), the addition of shims between the boom and the upper frame will not be required. If the total clearance is more than 1.0 mm (0.04 inch), add the correct thickness of shims to obtain the required clearance.

  6. Use the following table to determine the correct shims (20).

    Table 2
    Table for Shims (30) 
    Shim  Thickness (mm) 
    212-2838  2.0(1) 
    113-2127  0.5 
    093-0084  1.0 
    093-0116  2.0 
    (1) If this shim is required, use next to the boom.

  7. Install the correct shims.

  8. Repeat Steps 2 through 4.


    Illustration 4g01349064

  9. Install bolt (17).

  10. Install sensor (15) and install support (14).

  11. Install bolt (16).


    Illustration 5g01348675

  12. Install panels (11), (12), and (13).


    Illustration 6g01349070

  13. Position panel (10) and install bolts (9).


    Illustration 7g01348645

  14. Apply a thin coat of Tooling (D) to the pin.

  15. Partially install the pin and install shim (8).


    Illustration 8g01348639

  16. Attach a suitable lifting device to boom cylinder (5). The weight of boom cylinder (5) is approximately 285 kg (628 lb).


    Illustration 9g01349131

  17. Position boom cylinder (5) and spacer (7).


    Illustration 10g01348630

  18. Position retainer plate (6) and install bolts (4).

  19. Remove the suitable lifting device from boom cylinder (5).


    Illustration 11g01348621

  20. Connect grease hose assembly (4).

  21. Repeat for the opposite boom cylinder.


    Illustration 12g01348609

  22. Connect all hose assemblies (1) and connect harness assembly (2).

  23. Fill the hydraulic oil. Refer to Operation and Maintenance Manual, "Hydraulic System Oil - Change" for the correct filling procedure.

End By:

  1. Install the stick.

Information System:

New Cylinder Head Bolts are Now Used on Certain Excavators {5457, 5458}
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Swing)
325F Excavator Machine Systems Boom - Remove
C2.4 Tier 4 Final Engines for Caterpillar Built Machines Crankshaft - Install
312F and 313F Excavator Machine Systems Specifications
312F and 313F Excavator Machine Systems Gear Pump (Pilot) - Test
325F Excavator Machine Systems Boom Cylinder - Remove and Install
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System Swing Hydraulic System
325F Excavator Machine Systems Drift Reduction Valve (Boom) - Assemble
325F Excavator Machine Systems Drift Reduction Valve (Boom) - Disassemble
312F and 313F Excavator Machine Systems Pump Control (Negative Flow) - Test
Installation Procedure for the 467-4407 Front Lines Gp On Certain Hydraulic Excavators {5057}
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System Oil Makeup (Swing System)
300.9D VPS Mini Hydraulic Excavator Machine Systems Compression - Test
312F and 313F Excavator Machine Systems Engine Control
312F and 313F Excavator Machine Systems Electronic Control (Machine System)
312F and 313F Excavator Machine System Specifications Main Hydraulic Pump
312F and 313F Excavator Machine System Specifications Pump Head (Main)
318F Excavator Machine Systems Final Drive
312F and 313F Excavator Machine System Specifications Boom Cylinder Lines
Inspection of the Rear of the Engine on Certain C3.3, C4.4, and C7.1 Engines {1161, 1201}
316F Excavator Machine System Specifications Fuel Tank and Mounting
320D2 GC Excavator Engine Supplement Battery - Remove and Install
320D2 GC Excavator Engine Supplement Fuel Priming Pump - Remove and Install