325F Excavator Machine Systems Stick - Install Caterpillar


Stick - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
452-6006  Molybdenum Grease 

Note: Make sure that the pin bores in the stick and in the boom are thoroughly clean and free of dirt and debris prior to the installation of the stick on the boom.

  1. Apply a thin coat of Tooling (A) on the sleeve bearings. Apply a thin coat of Tooling (A) on the lips of lip type seals.


    Illustration 1g01006522
    Typical Example

  2. Start the machine. Raise the boom. Swing the boom over the stick. Align the pin bores for the boom and the stick.

  3. If necessary, install shims (7) (Not Shown) on each side of the boom between the boom and the stick at the pin bore. Adjust the lateral clearance to a max of 1.6 mm (0.06 inch).

  4. Install pin (6) andl bolt (4).


    Illustration 2g01006523

  5. Fasten a lifting sling to the rod end of stick cylinder (1). Extend stick cylinder (1) until the pin bore lines up with the pin bores in the stick. Install a shim on each side of the stick cylinder at the pin bore.

  6. Install the spacer and pin assembly (3). Install bolt (2).

  7. Remove the lifting sling. Remove the wood block between the stick cylinder and the boom.

    ------ WARNING! ------

    At operating temperature, the hydraulic oil is hot and under pressure. Hot oils can cause burns.

    To prevent possible personal injury, release the pressure in the work tool hydraulic circuit (boom, stick, bucket, and swing), travel circuits, and the hydraulic oil tank at the filler cap before any hydraulic lines or components are disconnected or removed.

    Remove the filler cap only when the engine is stopped and the filler cap is cool enough to touch.


  8. Release the system pressure.


    Illustration 3g01006521

  9. Connect hose assemblies (1).

    Note: Connect any additional auxiliary hose assemblies that may be present.

Information System:

Installation Procedure for the <NOBR>437-0403</NOBR> Pilot Lines Gp on Certain Hydraulic Excavators {5057, 5059}
Installation Procedure for the <NOBR>418-1101</NOBR> Chassis Wiring Gp On Certain Hydraulic Excavators {1408}
Installation Procedure for the <NOBR>416-5026</NOBR> Pilot Lines Gp on Certain Hydraulic Excavators {5057, 5059}
Installation Procedure for the <NOBR>330-2397</NOBR> Front Lines Gp on Certain Hydraulic Excavators {5057}
Installation of the <NOBR>501-2517</NOBR> Auxiliary Control Ar (Tool Control) on Certain Hydraulic Excavators {1408, 5051, 5057, 5059, 7301, 7405, 7557}
Installation of the <NOBR>501-2518</NOBR> Auxiliary Control Ar (Tool Control) on Certain Hydraulic Excavators {1408, 5051, 5057, 7405, 7557}
325F Excavator Machine Systems Stick Bearings and Seals - Install
325F Excavator Machine Systems Stick Bearings and Seals - Remove
325F Excavator Machine Systems Stick - Remove
910K, 914K and 920K Compact Wheel Loaders Bucket Tips - Inspect/Replace
325F Excavator Machine Systems Stick Cylinder - Remove and Install
300.9D VPS Mini Hydraulic Excavator Machine Systems Auxiliary Hydraulic System
Installation Procedure for the <NOBR>330-2400</NOBR> Front Lines Gp on Certain Hydraulic Excavators {5057}
Installation of the 486-0608 Coupler Control Ar on Certain Hydraulic Excavators {6129, 7332, 7405, 7557}
Installation of the 467-6748 Chassis Wiring Gp On Certain Hydraulic Excavators {6129}
300.9D VPS Mini Hydraulic Excavator Machine Systems Swing Hydraulic System
Procedure to Install a 455-6307 Gear Pump Group on Certain M318D MH and M322D MH Material Handlers {5073}
312F and 313F Excavator Machine Systems Return Hydraulic System
325F Excavator Machine Systems Drift Reduction Valve (Boom) - Remove and Install
Installation Procedure for the <NOBR>494-7661</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {5057, 5059, 5063, 7405, 7557}
Installation Procedure for the <NOBR>330-2550</NOBR> Pilot Lines Gp on Certain Hydraulic Excavators {5057, 5059}
Installation of the <NOBR>491-4423</NOBR> Auxiliary Control Ar (Medium Pressure) on Certain Hydraulic Excavators {5051, 5070, 5073}
Installation Procedure for the <NOBR>428-8276</NOBR> Pilot Lines Gp On Certain Hydraulic Excavators {5057, 5059}
Installation of the <NOBR>489-0498</NOBR> Auxiliary Control Ar on Certain Hydraulic Excavators {1408, 5057, 5059, 5070, 5073, 7405, 7557}