325F Excavator Machine Systems Stick - Remove Caterpillar


Stick - Remove
`
1.1. Removal Procedure

Removal Procedure

Start By:

  1. Remove the bucket.

  1. Start the machine. Fully retract the bucket cylinder. Secure the linkage to the stick.


    Illustration 1g01006521

  2. Fully extend the stick cylinder. Lower the stick to the floor. Block the end of the stick that connects to the boom. Stop the engine.

  3. Place suitable cribbing under the stick cylinder.


    NOTICE

    Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

    Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products.

    Dispose of all fluids according to local regulations and mandates.


    ------ WARNING! ------

    At operating temperature, the hydraulic oil is hot and under pressure. Hot oils can cause burns.

    To prevent possible personal injury, release the pressure in the work tool hydraulic circuit (boom, stick, bucket, and swing), travel circuits, and the hydraulic oil tank at the filler cap before any hydraulic lines or components are disconnected or removed.

    Remove the filler cap only when the engine is stopped and the filler cap is cool enough to touch.


  4. Release hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release".

  5. Disconnect hose assemblies (1).

    Note: Disconnect any additional auxiliary hose assemblies that may be present.



    Illustration 2g00686768

  6. Remove retaining bolt (2) from pin assembly (3).

    Note: Shims are located between the stick cylinder and the stick at the pin bore.

  7. Remove pin assembly (3) and the spacer from the stick.

  8. Start the machine. Fully retract the stick cylinder. Stop the engine.

  9. Remove the shims that are located between the stick cylinder and the stick at the pin bore.


    Illustration 3g01006522

  10. Remove retaining bolt (4) from pin assembly (5).

    Note: Shims are located between the boom and the stick at the pin bore.

  11. Start the machine. Raise the boom away from the stick.

    Note: The wood blocks that are located between the stick and the boom will fall when the boom is raised.

    Note: The weight of the stick is approximately 651 kg (1435 lb).

  12. Swing the machine so that the boom may be lowered to the floor. Lower the boom to the floor. Stop the engine.

  13. Remove the shims that are located between the stick and the boom at the pin bore.

Information System:

910K, 914K and 920K Compact Wheel Loaders Bucket Tips - Inspect/Replace
325F Excavator Machine Systems Stick Cylinder - Remove and Install
300.9D VPS Mini Hydraulic Excavator Machine Systems Auxiliary Hydraulic System
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System Boom Hydraulic System
910K, 914K and 920K Compact Wheel Loaders Operation Information
318F Excavator Machine Systems Front Lines
316F Excavator Machine System Specifications Pilot Lines (Main Pump)
Exhaust Gas Valve (NRS) for C7.1, and C6.6 Engines {5137}
312F and 313F Excavator Machine Systems Travel System
349D2 MHPU Mobile Hydraulic Power Unit Hydraulic System Relief Valve (Main)
300.9D VPS Mini Hydraulic Excavator Machine Systems Stick Hydraulic System
300.9D VPS Mini Hydraulic Excavator Machine Systems Bucket Hydraulic System
325F Excavator Machine Systems Stick Bearings and Seals - Remove
325F Excavator Machine Systems Stick Bearings and Seals - Install
Installation of the <NOBR>501-2518</NOBR> Auxiliary Control Ar (Tool Control) on Certain Hydraulic Excavators {1408, 5051, 5057, 7405, 7557}
Installation of the <NOBR>501-2517</NOBR> Auxiliary Control Ar (Tool Control) on Certain Hydraulic Excavators {1408, 5051, 5057, 5059, 7301, 7405, 7557}
Installation Procedure for the <NOBR>330-2397</NOBR> Front Lines Gp on Certain Hydraulic Excavators {5057}
Installation Procedure for the <NOBR>416-5026</NOBR> Pilot Lines Gp on Certain Hydraulic Excavators {5057, 5059}
Installation Procedure for the <NOBR>418-1101</NOBR> Chassis Wiring Gp On Certain Hydraulic Excavators {1408}
Installation Procedure for the <NOBR>437-0403</NOBR> Pilot Lines Gp on Certain Hydraulic Excavators {5057, 5059}
325F Excavator Machine Systems Stick - Install
Installation Procedure for the <NOBR>330-2400</NOBR> Front Lines Gp on Certain Hydraulic Excavators {5057}
Installation of the 486-0608 Coupler Control Ar on Certain Hydraulic Excavators {6129, 7332, 7405, 7557}
Installation of the 467-6748 Chassis Wiring Gp On Certain Hydraulic Excavators {6129}