349E Excavator Hydraulic System Solenoid Valve (Proportional Reducing) - Calibrate - Boom Down Regeneration Caterpillar


Solenoid Valve (Proportional Reducing) - Calibrate - Boom Down Regeneration
`
1.1. Introduction
2.2. Preliminary Test
3.1. Required Tools
4.1. Machine Preparation
5.1. Calibration Procedure

Introduction

The boom hydraulic circuit contains a regeneration circuit. This regeneration circuit allows the return oil from the head end of the boom cylinders to be supplied to the rod end of the boom cylinders during the BOOM DOWN operation. The proportional reducing valve (PRV) for the boom regeneration valve controls the amount of pilot pressure from the joystick to the boom down regeneration valve. The PRV for the boom regeneration valve is controlled by the machine ECM.

Preliminary Test

  • Testing and Adjusting, "Relief Valve (Pilot) - Test and Adjust"

  • Testing and Adjusting, "Solenoid Valve (Proportional Reducing) - Calibrate (Power Shift Pressure)"

  • Testing and Adjusting, "Solenoid Valve (Proportional Reducing) - Calibrate (Negative Flow Control)"

Required Tools



Illustration 1g02571852
Tooling (A) 198-4240 Digital Pressure Indicator Gp

Table 1
Tool  Item  Qty  Part Number  Description 
  198-4240  Digital Pressure Indicator Gp 
  A1  198-4234  Indicator 
A2 198-4237  Pressure Sensor 3447 kPa (500 psi) 
A3 198-4236  Extension Cable 

Machine Preparation

  1. Position the machine on level ground.

  2. Stop the engine

  3. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".


    Illustration 2g02141845
    (1) Pressure tap for the proportional reducing valve (boom regeneration valve)
    (2) Pilot manifold
    (3) Panel

  4. Connect a 3447 kPa (500 psi) pressure sensor to the pressure tap for the boom regeneration valve. The pressure tap for the boom regeneration valve is located below the main control valve. The pressure tap can be accessed through panel (3).

Calibration Procedure

  1. Start the engine.

  2. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  3. Place the hydraulic activation lever in the UNLOCK position.

  4. Place the machine implements on the ground at maximum reach.

  5. Enter the service mode. Input the password "9992".


    Illustration 3g02550247

  6. Select "Boom Down Regen Valve" from the "Calibrations" menu.

  7. Press the OK key in order to start the calibration. The engine RPM will automatically drop to the equivalence of engine speed dial 1.

  8. Confirm the notes on the monitor display. Set up the test conditions in accordance with the instructions. Press the OK key.

  9. Move the joystick for BOOM DOWN to the full down position and hold the joystick in this position.


    Illustration 4g02550277

  10. Use the arrows to adjust the pressure until the pressure reading for the boom regeneration valve is at 500 ± 50 kPa (73 ± 7 psi). Press the OK key.

  11. Move the joystick for BOOM DOWN to the NEUTRAL position.

  12. Confirm notes on the monitor display. Set up the test conditions in accordance with the instructions. Press the OK key.

  13. Move the joystick for BOOM DOWN to the full down position and hold the joystick in this position.


    Illustration 5g02550318

  14. Use the arrows to adjust the pressure until the pressure reading for the boom regeneration valve is at 2500 ± 50 kPa (363 ± 7 psi). Press the OK key.

  15. Move the joystick for BOOM DOWN to the NEUTRAL position.


    Illustration 6g02550516

  16. If calibration was successful and no errors occurred, the display will indicate that the calibration is complete.


    Illustration 7g02550596

  17. The "Error" screen will be displayed on the monitor if an error occurs. The process of calibration will not be saved and the process must be restarted.

Information System:

330D and 336D Excavators and 330D Material Handlers Machine System Specifications Bucket Linkage
330D and 336D Excavators and 330D Material Handlers Machine System Specifications Stick - 6.00 m (19.7 ft)
330D and 336D Excavators and 330D Material Handlers Machine System Specifications Boom - 9.00 m (29.5 ft)
C15 and C18 Engines for Caterpillar Built Machines Disconnecting Snap To Connect Fittings
349F and 352F Excavators Hydraulic System Solenoid Valve (Proportional Reducing) - Calibrate - Power Shift Pressure
349E Excavator Machine System Specifications Travel Motor
349F and 352F Excavators Hydraulic System Solenoid Valve (Proportional Reducing) - Calibrate - Negative Flow Control
330D and 336D Excavators and 330D Material Handlers Machine System Specifications Stick - 7.12 m (23.360 ft)
P315, P325, P335 and P360 Hydraulic Crushers Ripper Tooth - Remove and Install
P315, P325, P335 and P360 Hydraulic Crushers Ripper Tooth - Remove and Install
349F and 352F Excavators Hydraulic System Cylinder Speed - Check
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Cooling System Package (Radiator, Hydraulic Oil Cooler, and Aftercooler) - Remove and Install
Know Your Cooling System{0708, 1000, 1350, 7000}
Improvements on the Hydraulic Cylinder for the Log Fork{5807}
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit Machine Systems Control Valve (Quick Coupler) - Remove and Install
349E Excavator Hydraulic System Relief Valve (Pilot) - Test and Adjust
349E Excavator Hydraulic System Boom Hydraulic System
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit Machine Systems Swing Drive - Remove and Install
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit Machine Systems Control Valve (Medium Pressure) - Remove and Install
2010/03/31 Locking Screw for the Fuel Injection Pump on the 3054E and 3056E Engines {1251, 1290}
OEM Solutions Group Product Commonality Chart {7000}
336E Excavator and 336E MHPU Mobile Hydraulic Power Unit C9.3 Engine Supplement Fan and Fan Drive - Remove and Install
Oil and Your Engine {1000}
349F and 352F Excavators Hydraulic System Relief Valve (Main) - Test and Adjust