Since the pressure specifications, the flow rate, and engine rpm may vary with types and/or suppliers of a work tool, it is very important to follow the specifications of the supplier. Failure to follow the specifications of the supplier could result in poor performance of the work tool.

  1. Position the machine on level ground.

  1. Stop the engine.

  1. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "Hydraulic System Pressure - Release" for the machine.



    Illustration 1g01000946

    Pump compartment for the 320C and the 322C

    (26) Pressure tap (idler pump)

    (27) Pressure tap (drive pump)

    (37) Pressure tap (power shift)




    Illustration 2g01000947

    Pump compartment for the 325C

    (26) Pressure tap (idler pump)

    (27) Pressure tap (drive pump)

    (37) Pressure tap (power shift)

  1. Connect a 40000 kPa (5800 psi) pressure gauge to pressure tap (27) . Connect a 6000 kPa (870 psi) pressure gauge to pressure tap (37) . This is used to monitor power shift pressure.

    Note: Refer to Illustration 1 for the 320C and the 322C machines.

    Note: Refer to Illustration 2 for the 325C machines.




    Illustration 3g00826701

    (A) Rocker switch for one pump flow and two pump flow

    (1) One pump flow

    ( 2) Two pump flow

    (B) Rocker switch for one-way flow and two-way flow

    (3) Rocker switch for one-way flow

    (4) Switch for two-way flow

  1. Excavators that are equipped with System 2 have a one pump/two pump switch and a one-way/two-way flow switch. Both switches are located on the inside of the cab. Be sure that the cab switch for one pump/two pump flow (A) is set for the flow of one pump (2) . Be sure that the cab switch for one-way flow and two-way flow (B) is set for one-way flow (4) .



    Illustration 4g00994459

    Stop valve

  1. Close the ball valve for the work tool at the end of the stick.



    Illustration 5g01008955

    (7) Up key

    (8) Left key

    (9) Right key

    (10) Down key

    (11) Cancel key

    (12) Set key

    (13) Menu key

    (14) OK key




    Illustration 6g00986293

    Typical example of default display screen

  1. Turn the engine start switch to the ON position. The default display screen will show on message display.



    Illustration 7g00789231

    Main menu display

  1. Press menu key (13) in order to change from the default display screen to the main menu.



    Illustration 8g00786650

  1. Press down key (10) in order to highlight the "Select Tool" option. When the "Select Tool" option is highlighted, press OK key (14) .

  1. The current tool is shown. After a few seconds, you will be prompted to enter a password.



    Illustration 9g00786656

  1. Press left key (8) or right key (9) in order to select the desired position. Press up key (7) or down key (10) in order to input the password.

    Note: The password is alphanumeric. You may choose from 0 to 9. You may choose from "A" to "F". The initial password is "0001".

  1. Press OK key (14) when you finish entering the password.



    Illustration 10g00994626

  1. The tool that is selected is shown after entering the "Select Tool" menu.

  1. Press right key (9) or left key (8) in order to scroll through the different tools. Highlight the correct auxiliary tool and press set key (12) .

  1. Start the engine.

  1. Place the machine controls at the following settings: the engine speed dial at 10 and the AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance - Test - Engine Speed" for the machine for engine rpm settings.

  1. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  1. Start Service Mode and input a fixed power shift pressure of 2900 kPa (420 psi).

    1. Press menu key (13) .

      Note: The option on the main menu display will be cancelled if thirty seconds or more elapse between keystrokes . The display is restored to the message display.

    1. Press down key (10) in order to highlight the menu item "SERVICE OPTIONS" on the message display. Press OK key (14) .

    1. Input the password "FFF2". Press left key (8) or right key (9) in order to change the position of the flashing character. Press up key (7) or press down key (10) in order to change the value of the flashing character. Press OK key (14) after the correct password is displayed.

    1. Press down key (10) in order to highlight the menu item "ECM SUMMARY" on the message display.

    1. Press right key (9) repeatedly until "DEVICE TEST" appears on the message display.

    1. Press down key (10) in order to move down one line on the message display.

    1. Press right key (9) until the "PS PRV - FIXED" appears on the message display.

    1. Press down key (10) .

    1. Press OK key (14) . The display on line 4 of the message display will now change to a numeric value. These characters represent the power shift pressure (kPa).

    1. Press left key (8) or right key (9) in order to increase or decrease the desired numeric value that is displayed on line 4 of the message display to "2900". Pressing left key (8) one time decreases the power shift pressure 10 kPa (1.5 psi). Pressing right key (9) one time increases the power shift pressure 10 kPa (1.5 psi).

      Note: The value for power shift pressure on the monitor may not always match the pressure reading on the pressure gauge. Adjust the value on the monitor until the desired power shift pressure is attained on the pressure gauge that is connected to the pressure tap for power shift pressure. The actual power shift pressure must be 2900 kPa (420 psi) on the pressure gauge.

      Note: To prevent a change in power shift pressure during the relief valve adjustment, do not turn the engine start switch to the OFF position.

      Note: Refer to Service Manual, RENR3814, "Engine and Pump Control System" for additional information on Service Mode.

      Note: The pressure setting from the factory for the line relief valves in the one-way flow circuit is 20600 ± 1500 kPa (2990 ± 220 psi).




    Illustration 11g00771493

    (14) Line relief valve

    (15) Locknut

    (16) Adjustment screw




    Illustration 12g00690414

    (1) Right foot pedal for the work tool

    (2) Left foot pedal for the work tool

  1. Press and hold the device for activation.



    Illustration 13g00994456

    (3) Line relief valve that is located near the boom foot

    (15) Locknut

    (16) Adjustment screw

  1. If the pressure gauge reading on pressure tap (27) is too high, go to step 21. If the pressure gauge reading on pressure tap (27) is too low, perform the following steps:

    1. Release the device for activation.

    1. Loosen locknut (15) . Turn adjustment screw (16) clockwise.

    1. Tighten locknut (15) .

      Torque for locknut (15) ... 50 ± 10 N·m (37 ± 7 lb ft)

    1. Press and hold the device for activation.

    1. Repeat steps 20.a through 20.d in order to set the specified pressure.

  1. If the pressure gauge reading on pressure tap (27) is above the specification perform the following steps:

    1. Release the device for activation.

    1. Loosen locknut (15) . Turn adjustment screw (16) counterclockwise.

    1. Tighten locknut (15) .

      Torque for locknut (15) ... 50 ± 10 N·m (37 ± 7 lb ft)

    1. Press and hold the device for activation.

    1. Repeat steps 21.a through 21.d in order to set the specified pressure.

Information System:

5230B Excavator Machine Systems Swing Drive
320C, 322C and 325C Excavators Tool Control System System 2: Relief Valve (Line) - Test and Adjust - Auxiliary Control Valve
320C, 322C and 325C Excavators Tool Control System System 2: Solenoid Valve (Proportional Reducing) - Calibrate - Negative Flow Control
320C, 322C and 325C Excavators Tool Control System System 2: Default Value of Work Tool Parameters
345B Series II Excavator SmartBoom Control
345B Series II Excavator Joystick Controls - SmartBoom Control
345B Series II Excavator Engine Speed Control
320B, 320B L and 320B N Excavators Travel in Water and Mud
320C, 322C and 325C Excavators Tool Control System System 1: Solenoid Valve (Proportional Reducing) - Calibrate - Negative Flow Control
320C, 322C and 325C Excavators Tool Control System System 1: Relief Valve (Line) - Test and Adjust - Work Tool
5230B Excavator Electronic Systems Guide Location of Sensors
446B Backhoe Loader Transmission (Autoshift) Transmission Control
320C, 322C and 325C Excavators Tool Control System System 11: Default Value of Work Tool Parameters
320C, 322C and 325C Excavators Tool Control System System 11: Solenoid Valve (Proportional Reducing) - Calibrate - Negative Flow Control
320C, 322C and 325C Excavators Tool Control System System 11: Relief Valve (Line) - Test and Adjust - Auxiliary Control Valve
320C, 322C and 325C Excavators Tool Control System System 11: Relief Valve (Line) - Test and Adjust - Work Tool
320C, 322C and 325C Excavators Tool Control System System 11: Relief Valve (Line) - Test and Adjust - Auxiliary Control Valve (Medium Pressure)
345B Series II Excavator Fuses - Replace
345B Series II Excavator Hydraulic System Filter Element (Fine Filtration) - Replace - If Equipped
345B Series II Excavator Hydraulic System Pressure Gauge (Fine Filtration Filter) - Inspect - If Equipped
385B Excavator Capacities (Refill)
312C Excavator Machine Systems Alternate Pattern Control Valve - Remove
325C and 325C L Excavator Bucket Linkage (D Family) - Lubricate
C15 Petroleum Generator Set Engines Electronic Unit Injector Mechanism