Specification

Table 1
"Relief Valve (Main) - Test and Adjust" 
Date  Machine Serial Number 
Machine Settings  Engine Speed 
Speed Dial "10"
AEC switch OFF
Item  Specification  Actual 
Main Relief(1)  Implement  30500 ± 500 kPa (4424 ± 73 psi)   
Travel 35000 ± 500 kPa (5076 ± 73 psi)   
(1) To adjust the main relief valve, always adjust the travel main relief valve before adjustments are made to the implement main relief valve. An adjustment to the travel operation of the main relief valve will change the pressure setting of the implement operation of the main relief valve.


Illustration 1g02723671
Main relief valve

Table 2
Torque Specification 
Item  Part  Torque 
(1)  Relief Valve  73.5 ± 4.5 N·m (54.2 ± 3.3 lb ft) 
(3)  Locknut (implement)  29.4 ± 2 N·m (21.7 ± 1.5 lb ft) 
(5)  Locknut (travel)  29.4 ± 2 N·m (21.7 ± 1.5 lb ft) 

Introduction

The main relief valve is located in the top of the main control valve. The main relief valve limits the maximum operating pressure of the travel hydraulic circuit and the implement hydraulic circuits when the machine is at a load condition.



Illustration 2g02723562
Main control valve
(1) Main relief valve

Required Tools



Illustration 3g02571852
Tooling (A) 198-4240 Digital Pressure Indicator Gp


Illustration 4g03261789
(D) Track Block

Table 3
Tool  Item  Qty  Part Number  Description 
  198-4240  Digital Pressure Indicator Gp 
  A1  198-4234  Indicator 
A2 198-4239  Pressure Sensor 41,368 kPa (6,000 psi) 
A3 198-4236  Extension Cable 
418-3610  Track Block 

Machine Preparation

  1. Position the machine on level ground and stop the engine.

  2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "System Pressure - Release".


    Illustration 5g02761297
    Pressure tap for the drive pump

  3. Attach a 41,368 kPa (6,000 psi) pressure sensor to the pressure tap for the drive pump.

Test Procedure

Note: To adjust the main relief valve, always adjust the travel main relief valve before adjustments are made to the implement main relief valve. An adjustment to the travel operation of the main relief valve will change the pressure setting of the implement operation of the main relief valve.

Travel Operation



    Illustration 6g03340595
    (D) Track Block
    (6) Sprocket

  1. Place track block (D) in sprocket (6) to block forward right travel.

  2. Start the engine.

  3. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  4. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF.

  5. Slowly move the right travel control lever to full FORWARD position and check the pressure gauge reading. The pressure setting should be 35000 ± 500 kPa (5076 ± 73 psi).

  6. Return the right travel control lever to the NEUTRAL position.

  7. If the main relief valve pressure setting is not within the specification, adjust the main relief valve pressure setting.

Implement Operation

  1. Start the engine.

  2. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF.

  3. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  4. Slowly move the joystick for the bucket to the BUCKET CLOSE position (full extension of the bucket cylinder). Check the pressure gauge reading. The pressure setting should be 30500 ± 500 kPa (4424 ± 73 psi).

  5. Return the joystick for the bucket to the NEUTRAL position.

  6. If the main relief valve pressure setting is not within the specification, adjust the main relief valve pressure setting.

Adjustment Procedure

Note: To adjust the main relief valve, always adjust the travel main relief valve before adjustments are made to the implement main relief valve. An adjustment to the travel operation of the main relief valve will change the pressure setting of the implement operation of the main relief valve.

Travel Operation



    Illustration 7g02552019
    Cutaway of the main relief valve
    (1) Main relief valve
    (2) Adjustment screw (implement)
    (3) Locknut (implement)
    (4) Adjustment screw (travel)
    (5) Locknut (travel)

  1. To adjust the travel main relief valve, loosen the locknut (5) and turn the adjustment screw (4) until the pressure reading at the pressure tap for the drive pump is 35000 ± 500 kPa (5076 ± 73 psi).

    Note: Turn the adjustment screw clockwise to increase the pressure. Turn the adjustment screw counterclockwise to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  2. Tighten the locknut (5) to a torque of 29.4 ± 2 N·m (21.7 ± 1.5 lb ft).

Implement Operation



    Illustration 8g02552019
    Cutaway of the main relief valve
    (1) Main relief valve
    (2) Adjustment screw (implement)
    (3) Locknut (implement)
    (4) Adjustment screw (travel)
    (5) Locknut (travel)

  1. To adjust the implement main relief valve, loosen the locknut (3) and turn the adjustment screw (2) until the pressure reading at the pressure tap for the drive pump is 30500 ± 500 kPa (4424 ± 73 psi).

    Note: Turn the adjustment screw clockwise to increase the pressure. Turn the adjustment screw counterclockwise to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  2. Tighten the locknut (3) to a torque of 29.4 ± 2 N·m (21.7 ± 1.5 lb ft).

Information System:

320D2 GC Excavator Engine Supplement Air Cleaner - Remove and Install
320D2 GC Excavator Engine Supplement Fuel Priming Pump - Remove and Install
320D2 GC Excavator Engine Supplement Battery - Remove and Install
316F Excavator Machine System Specifications Fuel Tank and Mounting
Inspection of the Rear of the Engine on Certain C3.3, C4.4, and C7.1 Engines {1161, 1201}
312F and 313F Excavator Machine System Specifications Boom Cylinder Lines
318F Excavator Machine Systems Final Drive
312F and 313F Excavator Machine System Specifications Pump Head (Main)
312F and 313F Excavator Machine System Specifications Main Hydraulic Pump
312F and 313F Excavator Machine Systems Electronic Control (Machine System)
312F and 313F Excavator Machine Systems Engine Control
300.9D VPS Mini Hydraulic Excavator Machine Systems Compression - Test
320D2 GC Excavator Engine Supplement Water Pump - Remove and Install
318F Excavator Machine Systems Machine System
320D2 GC Excavator Engine Supplement Crankshaft Vibration Damper and Pulley - Remove and Install
320D2 GC Excavator Engine Supplement Refrigerant Compressor - Remove and Install
320D2 GC Excavator Engine Supplement Refrigerant Condenser - Remove and Install
Repair Procedure for the Front Tooth Seat on Certain MP324 D and MP324 CC Jaw Sets {6349}
320D2 GC Excavator Engine Supplement Receiver Dryer (Refrigerant) - Remove and Install
320D2 GC Excavator Engine Supplement Hood - Remove and Install
Visual Service Procedures - Colors and Symbols {0374, 7000, 7006, 7960}
The Axle Hub Shaft Seal is Leaking on The Steering Axle of Certain Machines {3256, 3258, 3260, 4251}