- Excavator:
- 320D (S/N: FNA1-UP; DFB1-UP)
- 320D (S/N: MDE1-UP)
- 320D (S/N: A6F1-UP)
- 320D (S/N: A8F1-UP)
- 320D (S/N: A9F1-UP; KGF1-UP; MGG1-UP; DHK1-UP; FAL1-UP; WJN1-UP; BWP1-UP; AZR1-UP; SNS1-UP; EBT1-UP; CXY1-UP; BWZ1-UP; JFZ1-UP; JGZ1-UP)
- 323D (S/N: PBE1-UP; LFL1-UP)
- 320D (S/N: MDE1-UP)
- Work Tool:
- HYDRAULIC KIT (S/N: HKD1-UP)
Introduction
This Special Instruction provides the information that is necessary to install the 259-5045 Combined Flow Wiring Gp on certain excavators.
Safety Section
![]() | |
Illustration 1 | g00104545 |
Attach a "Do Not Operate" warning tag or a similar warning tag to the start switch or to the controls before you service the equipment. These warning tags (Special Instruction, SEHS7332) are available from your AVSpare dealer.
![]() |
Check valves in the hydraulic system may allow pressure to exist in the hydraulic lines after the engine has been stopped. Pressure must be relieved prior to servicing the components of the hydraulic system. Failure to relieve pressure prior to servicing may result in personal injury. |
![]() |
Required Parts
Required Parts 259-5045 Combined Flow Wiring Gp     |
|||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
(1)     | 23     | 3S-2093     | Cable Strap     |
(2)     | 11     | 7K-1181     | Cable Strap     |
(3)     | 2     | 111-4836     | Clip     |
(4)     | 1     | 116-0118     | Clip     |
(5)     | 4     | 204-1611     | Cable Strap     |
(6)     | 1     | 267-7636     | Auxiliary Harness As     |
(7)     | 1     | 132-5789     | Clip     |
(8)     | 1     | 156-6175     | Clip     |
(9)     | 1     | 4P-7581     | Bracket     |
(10)     | 3     | 8T-4121     | Hard Washer     |
(11)     | 1     | 8T-4137     | Bolt     |
(12)     | 1     | 8T-4171     | Bolt     |
(13)     | 2     | 8T-4191     | Bolt     |
(14)     | 1     | 8T-4195     | Bolt     |
(15)     | 1     | 9X-8256     | Washer     |
Installation Procedure
- Locate the flow control valve inside of the pump compartment.
![]() | |
Illustration 2 | g02138896 |
- Locate the chassis harness inside the right frame rail of the machine. Cut the strap securing the chassis harness. Route the harness through the wall of the pump compartment to the flow control valve.
![]() | |
Illustration 3 | g02139405 |
View in pump compartment |
- Connect the chassis harness to the flow control valve solenoid at terminal "M737 WH", and "M739 YL".
- Attach clip (8) on to the flow control valve. Use washer (15), and bolt (12). Secure the chassis harness to clip (8) with, and strap (1) .
- Locate the solenoid valve inside the pump compartment.
![]() | |
Illustration 4 | g02139495 |
View in pump compartment |
- Make three terminal connections with wire harness (6) to the solenoid valve.
- Fasten clip (7) on to solenoid valve support using washer (10) and bolt (13). Secure wire harness (6) to clip (7). Use strap (1) .
- Fasten the ground terminal "235 BK" to the existing bulkhead prior to routing harness through the opening.
![]() | |
Illustration 5 | g02139508 |
View in pump compartment |
- Route wire harness (6) through the opening in the right-hand frame rail of the machine.
Note: Two terminals "K872 OR", "200 BK" should not route through the frame rail. This portion of the wire harness will be installed last.
- Route terminal "G973 OR", "235 BK" along the back side of the main control valve up to the pressure switch located on port "aL4". The pressure switch is located on the upper left-hand side of the main control valve.
![]() | |
Illustration 6 | g02139780 |
View of main control valve |
![]() | |
Illustration 7 | g02139522 |
Detail A |
- Make the terminal connection to the pressure switch.
- Make the ground connection to the bulkhead in between the engine compartment and the main control valve compartment.
![]() | |
Illustration 8 | g02139798 |
View of engine room |
- Route wire harness with terminal connections "147 PU", "G973 OR", "K866 WH", "K871 WH" along the backside of the engine compartment, to the chassis harness. Make terminal connections to the chassis harness.
![]() | |
Illustration 9 | g02139813 |
View of engine room |
- Make terminal connection to the cab harness.
![]() | |
Illustration 10 | g02139843 |
View of battery room |
![]() | |
Illustration 11 | g02139850 |
View of battery room |
- Fasten clip (4) to terminal inside the battery compartment. Remove the bolt securing clip for the platform harness. Place clip (4) and the clip for the platform harness together. Fasten in place with the existing bolt.
- Route the remaining portion of the wire harness along the outside of the right-hand frame rail toward the front of the machine.
![]() | |
Illustration 12 | g02139854 |
- Route harness through the opening in the right-hand frame rail next to the foot of the boom.
- Make the terminal connection to the solenoid valve, located on the right-hand frame rail.
![]() | |
Illustration 13 | g02139954 |
Valve - right hand |
- Fasten clip (9) onto the support below the solenoid valve. Use washer (10) and bolt (13). Secure the wire harness to clip (9). Use strap (1) .
- Fasten the ground "200 BK" to the existing ground point located on the right-hand frame rail, next to the opening in the frame rail.
- Route the remaining portion of the wire harness across the boom foot, to the solenoid valve located on the left-hand side of the frame.
![]() | |
Illustration 14 | g02139974 |
Valve - left hand |
- Make terminal connection to solenoid.
- Remove the bolt securing hose clip to support below the solenoid valve. Place clip (3) onto the hose clip and secure to the frame with washer (10), and bolt (11). Secure wire harness to clip using strap (1) .
- Mount clip (3) onto the support located on the backside of the boom foot with bolt (14). Secure the wire harness to clip (3), and strap (1) .
- Secure wire harness in place as needed using straps (1), straps (2), or straps (5) .